Lek
- Distribution sistem for oxygen and nitrogen
- Installation of new tableting machine
- CIP washing system in Ljubljana and in Poland
- Redesign of processing plant of syrups and solutions
- New line of packaging Swiftpack
- Relocation of production Autana from the plant Mengeš to plant in Lendava
- Vacuum emptying of the container Soneco
- Relocation of production of ointments
- Increasing the production of Amlodipine
- Distribution sistem of solvents inside the manufacturing plant Ljubljana
- Installation of packaging lines Ima Giant
- Relocation autoclaves
- Line for adsorption Vanko 2