Belinka

  • Increase height of oxidizer
  • Installation of deaerator
  • Installation and connection of the oxidation supply tank
  • Modernization of drying NaPB
  • Installation of a new conveyor belt for PBS1
  • Construction of a new drying line for NaPB
  • Reconstruction of the storage of flammable liquids
  • Replacing the condenser in the distillation of hydrogen peroxide
  • Production of membrane fertilizers